In September 2017, GSP-Project Ltd made research to improve the efficiency of the wastewater treatment process at WWTP Belgrankorm-VN company
(01.12.2017)

In June 2017, GSP-Project Ltd completed the research paper to make a feasibility study for the WWTP reconstruction and introduction of mechanical treatment process, modernization of averaging and sewage supply at Kirov BioKhim.
(20.10.2017)

In November 2014 under the project of Ivanovo WWTP reconstruction GSP-Project Ltd signed the contract for equipment supply.
(03.08.2017)

In 2004 according to the reorganization and modernization program the Sestroretsk WWTP it was equipped with a set of solutions Sulzer ABS.
(19.06.2017)

In March 2017, GSP-Project Ltd signed the contract for reconstruction engineering design of plant pumping station and stormwater collection system.
(31.03.2017)

In January 2017, GSP-Project Ltd negotiated the contract for engineering design of Kshenskiy sugar plant water recycling system reconstruction.
(17.03.2017)

GSP-Project Ltd completed a complex of wastewater treatment plants in the village of Yazykovo, Bashkortostan.
(13.02.2017)

In November 2016, GSP-project Ltd signed the agreement to develop engineering design of Kursk brewing company Ltd local WWTP.
(22.11.2016)

The GSP-Project Ltd experts made mathematical modeling of biological treatment processes; the airflow required for aeration as well as estimated reconstruction economic efficiency.
(23.09.2016)

The GSP-Project Ltd company won a contract for delivery of Sulzer turbocompressors in 2014, and by 2016 our experts have delivered equipment and have completed the adjustment and start-up of air-blowing station.
(20.05.2016)

Pages