Velikiye Luki biological wastewater treatment plant confronted serious challenges such as dramatic deterioration of incoming wastewater, high maintenance charges and low quality of wastewater treatment.
(19.05.2016)

In March 2016 the turbocompressor Sulzer type HST was successfully launched on WWTP in Berezovskiy city.
(11.03.2016)

As a part of modernization Submerged Sewage Pump Type XFP100E-CB1, with waterproof premium efficiency motors (3-phase with squirrel-cage motor), station was provided.
(20.10.2015)

In September 2015, GSP-Project Ltd signed the agreement for the development of recommendations on Tomsk WWTP reconstruction.
(17.09.2015)

In July 2015, Izhvodokanal addressed GSP-Project to get recommendations on energy efficiency improvement
(11.07.2015)

In autumn of 2014 GSP-Project Ltd negotiated the contract for providing and installation of four Sulzer pumps XFP301M series to replace current equipment at the Main Sewage Pump Station.
(02.07.2015)

In 2014, GSP-Project Ltd implemented the complex project of the reconstruction of sewage treatment facilities in the village Chekmagush, Republic of Bashkortostan.
(26.06.2015)

In 2013 GSP-Project Ltd started cooperation with CJSC “Vodokanal”, Novokuznetsk, Kemerovo region. In the middle of February 2015 the renewed pump was successfully started, having replaced old-fashioned equipment.
(13.02.2015)

GSP-Project Ltd became a participant of the Main Sewage Pumping Station modernization in Sarapul. MSPS was successfully started in January 2015.
(23.01.2015)

At the end of September 2014, the GSP-Project Ltd awarded a contract for the supply of Sulzer’s turbocompressors for reconstruction project in a Gusev WWTP, Kaliningrad region.