GSP-Project Ltd won tender to supply of the Sulzer HST30 high-speed turbocompessor. The equipment will be supplied to the Pskov WWTP under the project "Economically and Environmentally Sustainable Region of Lake Peipsi 2" of the Cross-Border Cooperation Program "Russia - Estonia 2014-2020". The turbocompressor will be installed in the air blowing station to provide airflow to the aeration tank with high efficiency.