Logotype Gsp Project
WATER AND WASTEWATER TECHNOLOGIES

You are here

News

GSP-Project Ltd supplies Sulzer submersible drainage pumps for the project of Kovalevka WWTP reconstruction
(07.07.2020)

The Head of the city of Izhevsk, Oleg Bekmemetyev during his inspection trip to the WWTP noted the importance of modernizing the water utility facilities
(18.06.2020)

GSP-Project Ltd supplies Sulzer high-efficiency submersible mixers for the Municipal Enterprise Gorvodokanal Pskov
(04.06.2020)

Controller EC 531 is an all-in-one unit for intelligent control and monitoring of sewage pumping stations with one or two pumps
(06.05.2020)

St. Petersburg's diary (SPb Dnevnik) published an interview with Vladimir Kim, CEO of GSP-Project Ltd
(20.04.2020)

GSP-Project Ltd has diagnosed Sulzer HST 6000 turbocompressors operating at the Pushkin WWTP
(10.03.2020)

GSP-Project supplies pumping station with Sulzer pumps equipment to the local WWTP of Izhmoloko factory, JSC MILCOM
(26.02.2020)

GSP-Project Ltd experts conducted diagnostics of high-speed turbocompressors Sulzer HST 40 after 1.5 years of operation at the Voronezh Left-bank WWTP (LLC LOS)
(28.01.2020)

GSP-Project Ltd has won a tender for providing Sulzer submersible sewage pumps XFP series for JSC Apatityvodokanal
(26.12.2019)

GSP-Project supplies Sulzer equipment for pumping and agitation at the Kezsky cheese factory’s WWTP, JSC MILCOM
(04.12.2019)

Pages