Kshenskiy sugar plant was put into service in 1951. The company turnover is up to 5000 tons of sugar beet per day. The plant is a part of Rusagro Group, one of the largest participants of Russian agrarian market.
In March 2017, GSP-Project Ltd signed the contract for reconstruction engineering design of plant pumping station and stormwater collection system.
The reconstruction allows dealing with inundation during the rain, reduces energy consumption and optimizes the existing pumping station.