Logotype Gsp Project
WATER AND WASTEWATER TECHNOLOGIES

You are here

Reference

In November 2016, GSP-project Ltd signed the agreement to develop engineering design of Kursk brewing company Ltd local WWTP.
(22.11.2016)

The GSP-Project Ltd experts made mathematical modeling of biological treatment processes; the airflow required for aeration as well as estimated reconstruction economic efficiency.
(23.09.2016)

The GSP-Project Ltd company won a contract for delivery of Sulzer turbocompressors in 2014, and by 2016 our experts have delivered equipment and have completed the adjustment and start-up of air-blowing station.
(20.05.2016)

Velikiye Luki biological wastewater treatment plant confronted serious challenges such as dramatic deterioration of incoming wastewater, high maintenance charges and low quality of wastewater treatment.
(19.05.2016)

In March 2016 the turbocompressor Sulzer type HST was successfully launched on WWTP in Berezovskiy city.
(11.03.2016)