GSP-Project Ltd completed a complex of wastewater treatment plants in the village of Yazykovo, Bashkortostan.
(13.02.2017)

In November 2016, GSP-project Ltd signed the agreement to develop engineering design of Kursk brewing company Ltd local WWTP.
(22.11.2016)

The GSP-Project Ltd experts made mathematical modeling of biological treatment processes; the airflow required for aeration as well as estimated reconstruction economic efficiency.
(23.09.2016)

The GSP-Project Ltd company won a contract for delivery of Sulzer turbocompressors in 2014, and by 2016 our experts have delivered equipment and have completed the adjustment and start-up of air-blowing station.
(20.05.2016)

Velikiye Luki biological wastewater treatment plant confronted serious challenges such as dramatic deterioration of incoming wastewater, high maintenance charges and low quality of wastewater treatment.
(19.05.2016)

In March 2016 the turbocompressor Sulzer type HST was successfully launched on WWTP in Berezovskiy city.
(11.03.2016)

As a part of modernization Submerged Sewage Pump Type XFP100E-CB1, with waterproof premium efficiency motors (3-phase with squirrel-cage motor), station was provided.
(20.10.2015)

In September 2015, GSP-Project Ltd signed the agreement for the development of recommendations on Tomsk WWTP reconstruction.
(17.09.2015)

In July 2015, Izhvodokanal addressed GSP-Project to get recommendations on energy efficiency improvement
(11.07.2015)

In autumn of 2014 GSP-Project Ltd negotiated the contract for providing and installation of four Sulzer pumps XFP301M series to replace current equipment at the Main Sewage Pump Station.